Structure Design audit of 3rd position berth. HPH Veracruz MEXICO.

Location

Veracruz (México)

Client

Internacional de contenedores asociados de Veracruz (ICAVE)

Service

Estructural project aduit and Infrastructure Design

Period

Completed (2014)

Detailed verification of dock structure design.
Two units are generated for berth -from 350m for container ships, and 216m for general ships and Ro-Ro type and containment structures, considering the following aspects:
-  Dock and containment structures. Structural and geotechnical review design and dimensioning of the project relating to new dock, whose typology is concrete platform on piles.
- Containment walls, including  different stages existing in demolition structures and construction of replaced / modified structures 
- Structures and adjacent buildings stability
- Any marine structure and facilities involved with the dock structure.