Residential development Olzinelles Sector

Location

Sant Celoni (Barcelona)

Client

Plaxic Estelar

Investment

3,1 M €

Service

Project Management

Period

Completed (2012)

Urbanization of the area enclosed by the C-35 Highway, rail tracks and Olzinelles St. and Indústria St. in Sant Celoni. This new city block is being developed within the development that the City of Sant Celoni has envisaged to the south of the RENFE rail tracks, as urban growth has been paralysed by the lack of physical space. The total urban area affected by these actions is 3.8ha, of which 12,153m² will be building plots (525 houses with shops and parking zones are planned), 7,000m² have been reserved for services, 7,430m² for roads and parking 6,894m² for parks and green areas.

Work carried out on the development of this sector:
  • Demolition of existing warehouses in Polygon 2, site preparation, earthmoving and paving of new roads, as well as all the complementary work such as paving roads and pavements, creation of new verges, parkland, landscaped traffic islands etc.
  • Network of services connected with sanitation and public lighting in anticipation of future under-road services.
  • Networks of services for medium-voltage and low-voltage power supply, water and irrigation, natural gas and telecommunications.
  • Demolition and /or diversion of all existing units not suitable for the new layout.