Refurbishment of Pierola Street and Sabadell old road

Location

Montcada i Reixac (Barcelona)

Client

Barcelona Infraestrucutres Municipals (BIMSA)

Investment

3,8 M €

Service

Infrastructure Construction Management

Period

Completed (2008)

Refurbishment of 3,500m² of existing road with provision of urban services, the routing underground of existing services and the channelling of the watercourse. Also noteworthy are the following:
  • Two reinforced concrete drains 2m in diameter and 60m long, built under the N-152.
  • Underpass 8 m wide under the FGC (Regional Government Rail) tracks.
  • Metal footbridge 25m long over FGC tracks.