Construction project of conditioning and widening of the BV-5251 road. Section: Sant Sadurní d’Osomort– Viladrau
Location
Catalunya
Client
INFRAESTRUCTURES.CAT
Investment
1,78 M€
Service
Infrastructure Design
Period
Completed (2010)
BV-5251 road widening and enforcement 6 layout changes to improve road safety. With the widening a section width 3m lanes (one lane in each direction) and hard shoulders 0.25 m will be set, and will provide the corresponding longitudinal drainage (gutters). Layout modifications are intended to remove some sections with sharp curves and improve road safety.
Previously also it made an inventory of existing elements and pavement defects.