Construction project for southern diverson Lleida (C-13). East connection. Section: Lleida

Location

Catalunya

Client

GISA

Investment

43 M€

Service

Infrastructure Design

Period

Completed (2008)

Widening of 5.4 km of the C-13 road and a new motorway 4 km long. This road will function as a southern diversion of Lleida in the section between the LL-11 and LL-12 motorhways.

It is interesting to highlight the following structures: 3 links in different levels, 127 m of viaducts in two FFCC railway lines and another 67 m viaduct crossing the Femosa River.